Monthly Archives: February 2014

Overcoming Believers Church

Wednesday, February 26, 2014

20140211_142742 20140211_142342 20140211_143659 20140211_143338

This project is a renovation and retrofit of an existing warehouse facility. The facility is being converted into a sanctuary and church facility with a 60’-0” precast prayer tower.  The foundation below has been designed to support the prayer tower.  We are working through this project in conjunction with Falconnier Design out of Knoxville, TN.

 

Pat Summit Plaza

Wednesday, February 12, 2014

 

 

 

 

 

PatSummit2PatSummit1PatSummit3

 

SummitPlazaModel

CSA is proud to have joined our friends at Studio Four Design to have been the Structural Engineer of Record for this Iconic Project located on the Campus of the University of TennesseeThe Pat Summit Plaza is a wonderful way to pay tribute to one of the greatest basketball coaches in the history of the game.  The arced and sloping retaining wall is approximately 26’-0” tall at its highest point and over 75 feet long.  CSA was able to use our 3D modeling software (Revit) to accurately model this complex geometrical shape.  The model was used to layout the foundations, construct the formwork, and create the signage mounted to the wall.  After construction, the finished concrete wall almost exactly matched the dimensions and layout given in the model.