Monthly Archives: January 2015

Lafollette Eye Clinic

Monday, January 26, 2015

CSA worked in conjunction with Fazio Architects to create this unique and modern Eye Clinic in Lafollette, TN.  The building consists of an 8,900 square foot 2 story structure built into the side of an existing hill.  The lower level exits to grade but consists of full height retaining walls at the front portion of the building.

IMG_1101 IMG_1104 IMG_1100 IMG_1099 OLYMPUS DIGITAL CAMERA

Construction Update: Contemporary Women’s Health

Monday, January 19, 2015

Check out these construction photos of a new office / medical building for Contemporary Womens’ Health located off of Pellissippi Parkway in Knoxville.  We designed this building in collaboration with Barber McMurry Architects and are excited to see it through to completion.  Check out the cantilevered slab and stair feature at the front!

OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA

Construction Update: St. Jude Parking Garage

Monday, January 12, 2015

This 9 story parking structure was designed in collaboration with Evans Taylor Foster Childress Architects. The parking garage will be 8 levels and will hold 1600 cars and will serve the St. Jude Children’s Research Center Complex in Memphis, TN.  The garage was constructed utilizing precast concrete double-tees, walls, and columns as required at an approximate cost of $21 million.

#6519 #6518 #6517 #6516

Construction Update: Clear Springs Baptist Church

Wednesday, January 7, 2015

New, three story, 70,000+ square foot church designed by Falconnier Design Company.  The structure consists of a mix of structural steel, hollow core planks, and reinforced masonry.

OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA